![]() Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Forward looking statements contained in this press release may include statements regarding the future operating or financial performance of Fission and Fission Uranium which involve known and unknown risks and uncertainties which may not prove to be accurate. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to". under the symbol "FCUUF" and on the Frankfurt Stock Exchange under the symbol 2FU.Ĭertain information contained in this press release constitutes "forward-looking information", within the meaning of Canadian legislation. Fission's common shares are listed on the TSX Exchange under the symbol "FCU" and trade on the OTCQX marketplace in the U.S. is a Canadian uranium project developer and 100% owner of the Patterson Lake South uranium property – a proposed high-grade uranium mine and mill in Canada's Athabasca Basin region. The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy, P.Geo., President and CEO for Fission Uranium Corp., a qualified person.įission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine. ![]() The 31,039-hectare PLS project is 100% owned and operated by Fission Uranium Corp. The Company is compiling the FS recommendations to formalize a scope of work for FEED and intends to appoint a lead consultant in Q2. This additional data will be used to update the hydrogeologic model to inform underground mine planning at Detailed Design. One pumping well was pressure grouted and re-drilled to determine the effectiveness of grouting on reducing hydraulic conductivity within the basement rock. Installation of three monitoring wells and two pumping wells totaling 962.8m of drilling were drilled in close proximity to the R780E crown pillar and on the hangingwall and footwall of the deposit. ![]() Hydrogeological holes to gather additional data on the hydraulic conductivity of the basement rock have been completed. Results from this survey will be used to inform future Detailed Design assessment. Data from seven holes totaling 772.6m of drilling has been collected to confirm Feasibility Level assessment and to inform future Detailed Design assessment.Ģ0 test pits along planned road allowances, the waste stockpile area and the mill area were completed to assess and support earthworks planning at Detailed Design.ĭownhole VSP geophysical surveys at the planned decline location and mill area have been completed. Geotechnical drill holes to support the design of the waste rock stockpiles and mill area facilities have been completed. The Environmental Assessment of the Project is continuing on schedule with community engagement, baseline assessment reporting and data compilation įEED phase advancing on schedule with Board approval of the 2023 budget įeasibility Study ("FS") concluded a construction timeline of 3 years with a projected mine life of 10 years and LOM production of 90.9 million lbs of U 3O 8įS determined an average unit operating cost of below US$10/lb U 3O 8 (approx. "Īn application for a License to Construct has been submitted to the CNSC per the requirements of the Nuclear Safety and Control Act Our development path to production is progressing on schedule and, at the same time, the fundamentals for uranium continue to strengthen in line with the global reactor construction boom. Additionally, we have successfully completed our winter field program, and the Front End Engineering Design work is well underway. Ross McElroy, President and CEO for Fission, commented, " I am very pleased to confirm that the construction license application for the PLS project has been submitted.
0 Comments
Leave a Reply. |